Difference between revisions of "Projects"

From CityGML Wiki
Jump to: navigation, search
imported>Fmohus
(Initiatives to define data exchange requirements for various processes of a construction project)
imported>Karl-Heinz Haefele
 
(18 intermediate revisions by 10 users not shown)
Line 1: Line 1:
  +
{| cellspacing="0" cellpadding="0"
== Companies using IFC today in design, construction and facility management projects ==
 
  +
|-
* Construction project of a new factory plant at Audi Ingolstadt --> more about the [http://www.buildingsmart.de/2/2_02.htm project] (in German)
 
  +
| width=50% valign=top |  
* Practical experiences in the office m-g-h for engineers and architects --> more about [http://www.m-g-h.de m-g-h]
 
  +
| width=5% align=right |  
* Experiences in development and use of a digital Building Information Model (BIM) according to IFC standards from the building project of Tromsø University College (HITOS) after completed Full Conceptual Design Phase --> [ftp://ftp.buildingsmart.no/pub/ifcfiles/HITOS/HITOS_Reports/HITOS_IFC_Report_%5BEnglish%5D.pdf the project report]
 
  +
| width=30% align=right | __TOC__
  +
|-
  +
|  
  +
|  
  +
|  
  +
|}
   
  +
== Companies and Cities using CityGML today in projects ==
== Initiatives to define data exchange requirements for various processes of a construction project ==
 
* The [[IDM | Information Delivery Manual]] or [[IDM]] development that aims to associate business processes with the IFC capabilities that provide specific support to the process.
 
   
  +
[http://www.gta-geoservice.de GTA GeoService GmbH]
* The [http://www.buildingsmart.de/2/2_02_01.htm BIM/IFC user guide] (''IFC Anwenderhandbuch'' - in German) describing the use of Building Information Models in the area of architecture and building services (including test files)
 
   
  +
[http://www.moss.de/english/m.o.s.s/ M.O.S.S. Computer Grafik Systeme GmbH]
* The [http://iweb.agc.org/iweb/Purchase/ProductDetail.aspx?Product_code=2926E AGC: The Contractors’ Guide to Building Information Modeling] was prepared in large part by contractors who spent time trying to sort out where to start. Their lessons are based on their experiences and were used in developing the guide. Although the process is evolving rapidly, the guide can serve as the basic framework for how to get started.
 
   
  +
[http://www.tridicon.de 3DCon GmbH]
* The [http://www.gsa.gov/Portal/gsa/ep/channelView.do?pageTypeId=8195&channelPage=%2Fep%2Fchannel%2FgsaOverview.jsp&channelId=-18161 GSA's BIM Guide Series] For all major projects (prospectus-level) receiving design funding in Fiscal Year 2007 and beyond, GSA will require spatial program BIMs be the minimum requirements for submission to OCA for Final Concept approvals by the PBS Commissioner and the Chief Architect. At the same time, all GSA projects are encouraged to deploy mature 3D, 4D, and BIM technologies—spatial program validation and beyond mdash; at strategic project phases in support of specific project challenges.
 
   
  +
[http://www.3d-stadtmodell-berlin.de/ Stadt Berlin]
== Projects defining new requirements for extending and improving IFC ==
 
  +
* The [[IFC for GIS]] or IFG project to define an interface between the AEC/FM or building construction world and the geographic information world
 
  +
[http://www.coburg.de Stadt Coburg]
  +
  +
[[Landeshauptstadt Stuttgart]]
  +
  +
[http://www.iscopeproject.net i-SCOPE Project]
  +
  +
[http://http://www.laiv-mv.de/land-mv/LAiV_prod/LAiV/AfGVK/ Landesamt für innere Verwaltung Mecklenburg-Vorpommern, Amt für Geoinformation, Vermessungs- und Katasterwesen]
  +
  +
== Projects defining new requirements for extending and improving CityGML ==

Latest revision as of 21:10, 22 February 2017